University of Chicago

PROJECT TYPE: Institutional
LOCATION: Chicago, IL
DATE: October 2024 / In-Progress



Project Process

PROJECT SPECIFICATIONS

60 x Post + Beam Table Lights
16 x Post + Beam Light Stands
Custom metal finishes and machined hardware

STEP 01 | PROJECT BRIEF

We met with the client to understand the project scope, scale, expectations, and deadlines. This ensured a mutual understanding of the project requirements to confirm aaline was the right fit for this custom order.

STEP 02 | PROJECT PROPOSAL

Based on specifications and custom requirements, a project proposal is issued from modifications of our existing products. This includes exploration from the design team of unique materials and product iterations.

STEP 03 | SHOP DRAWINGS

Shop drawings are issued for approval to confirm project details, dimensions, and general assembly.

STEP 04 | PRODUCTION

aaline’s skilled team of in-house fabrication specialists coordinate with the design team to being manufacturing.

STEP 05 | product life cycle

Impact Assessment Certificate
LCA | EPD | Declare
Right-to-Repair
Extended Warranty
Product Reclamation Program